The 44422 LOCOMOTIVE FUND
OVERHAUL 4

 Overhaul 1

Overhaul 2

Overhaul 3

 Overhaul 5

 Overhaul 6
 Overhaul 7

 Overhaul 8

 Overhaul 9

Final

 WSR 2006
       


 44422 chassis with the boiler temporarily replaced. 19/11/2003


 After the boiler was replaced, the locomotive was sheeted over for protection. Recent winds had removed the sheets so I took the opportunity to photograph it before it was resheeted. As ever, thanks to Stephen and the crew at LNWR. 19/11/2003

Home

Top